allow 2 min per call to cater for busy, no progress, etc
99 x 2 = 198 call minutes per hour
198/60 = number of lines to carry this traffic, = 4 lines = 4 fax machines.
This assumes you have control over when the calls are sent and they can be spread evenly over the time.
Author
Posts
Viewing 2 posts - 1 through 2 (of 2 total)
The forum ‘Call center’ is closed to new topics and replies.