I need to know if TCH re-assignment which takes place at MSC end during TCH assignment in case there is no TCH connection available and BSC replies with a message ” TCH assignment failure” ………………is this thing enable or can be enable in ALU and what are the parameters .
Regards
Author
Posts
Viewing 1 post (of 1 total)
The forum ‘Telecom Design’ is closed to new topics and replies.