25th June 2008 at 08:29
#37086
emma
Guest
Given the details below for an SSP
Load B / Load A ratio taken into account for the SSP 1.2
Number of BHCA 1,358,400
Average SSP CPU load 21.9%
how do i compute
1. SSP dynamic residual capacity?
2. SSP dynamic capacity (number of BHCA) ?