I have a question about half rate channel allocation.
In NOKIA we have three types of TS configuration possible: TCHF, TCH and TCHH and suppose we want to activate 2 half rate trx-s in a cell, but one trx will be configured as TCHD and the other as TCHH.
The question is:
– do we take in account the number of TS configured as TCHH, in the calculation of half rate TCH allocation?
thank you in advance,
bjushka
Author
Posts
Viewing 1 post (of 1 total)
The forum ‘Telecom Design’ is closed to new topics and replies.