Dear All
what is loop test in BTS.During integration if loop test fail between BTS and BSC,how it inturpt traffic or site commissioning.
I am working on Nokia Equipments.\
Plz guide me in detail.thanks
loop test determines the capability of the equipment to receive and transmit properly for any actual time.yes a loop test may fail depends upon what occasion you have done, trafic as i say is a part of both link between bts and bsc and msc for billing.
Sometimes, loop test are failed during commissioning.
After, if you realise Manual loop test, it is Ok.
I don’t why, it is strange.
Loop test commissioning is not a good reliable report.