Dear All
what is loop test in BTS.During integration if loop test fail between BTS and BSC,how it inturpt traffic or site commissioning.
I am working on Nokia Equipments.\
Plz guide me in detail.thanks
Author
Posts
Viewing 1 post (of 1 total)
The forum ‘Telecom Design’ is closed to new topics and replies.