3rd June 2005 at 01:07 #41204StuartGuest
Hello All.
If anyone requires information or help with the hardware and fault finding side of Ericssons RBS200, 2000 & 2206 series of BTS’s.
Please send me a message and I will try to help you out.
I have had over 6 years working with the installation, commisioning and testing of this equipment. My work collegues have also had many more years experience with this equipment.6th June 2005 at 10:01 #41205senthilGuestHi stuart,
I like to know the basics of BTS installation of ericsson, motorola….
thanks and regards
senthil6th June 2005 at 16:14 #41206Owain ColeGuestHi Stuart,
I’m interested in modelling Ericsson RBSs and I have a specific question.
I understand that you can chain RBS cabinates together such that the traffic from one cab is passed through to the transmission of the next.
However some of our users think that the ingress and egress 64k timeslots must be the same if the cabinate is in the 2000 series, but they can be different in the 200 series.
For example, can an RBS 2000 take traffic in on timeslot 5, but put that traffic out on timeslot 6.Is this restriction true for 200 series? 2000 series? 2600 series?
I’d be very interested to here all about this.
Many thanks,
Owain Cole12th June 2005 at 19:49 #41207SaidooooGuestmy question when i create DT for Ericsson RBS i want to know which softwear suitable & conficration for each type Ericsson RBS
for example RBS2206 conf. 2/2/2 softwear will be SWVER=B0531R0903
13th June 2005 at 06:36 #41208jackGuestHi Stuart,
Could you pls tell me how much is the power consumption of RBS2206? How much is heat dissipation of RBS2206?
thanks
14th June 2005 at 17:33 #41209timwGuestStuart,
I may have some work for you regarding installation of RBS’s.
Please contact me.
Tim3rd August 2005 at 10:51 #41210HerbertGuestHi Stuart,
Hi to allI have a question for you?
When will i used the Y-link cable for RBS 2202, If the configuration is 2+2+2, 3+3+3, 4+4+4. is that correct. If 5+5+5 means all cabinets are configured as master does it really means no bus cable and Y-link cable to used.
If im going to used Y-link which side to used the longer cable?
do you have wiring for this set-up
Please help im confused on this.
Thanks for your help
3rd August 2005 at 15:42 #41211tarun takkarGuestHi stuart,
I like to know the basics of BTS installation of ericsson
11th August 2005 at 11:54 #41212ibeachu chrisGuestplease can i know the command to get which RBLT number (from the bsc) is tied to a particular site.
11th August 2005 at 11:57 #41213JohnGuestRXTCP:MOTY=RXOTG,CELL=XXXXX;
WILL GIVE tg NUMBER13th August 2005 at 06:04 #41214chrisGuestHi john, i already know of the command you have there.i mean for example, if RBLT10 is connected to siteA and i don’t know the TG No, which command can i use to know the RBLT Number connected to that site.
13th August 2005 at 13:34 #41215JohnGuestSo you know the site number
use RXTCP to get the tg number then RXAPP:MO=RXOTG-X;
will give the RBLT range this will allow you to see the DIP number25th August 2005 at 08:12 #41216praveen bhasinGuestCould you pls tell me how much is the power consumption of RBS2206? How much is heat dissipation of RBS2206?
26th August 2005 at 16:41 #41217saleemGuesthi stuart i need a manuals of installation , commisioning and integeration of BTS of Ericssons RBS200, 2000 & 2206 . please help me and send me on my email address brave_saleem@yahoo.com or saleemabbas97@hotmail.com thanks
26th August 2005 at 19:39 #41218Muhammad AliGuesthi Stuart,
i am student of MSc Mobile Communciation can i get the manuals for Cell Planning and Optmization and also the installation manuals of Ericssons RBS200, 2000 & 2206 series of BTS’s on my email address capricorn_81_99@yahoo.com
thnx -