- This topic has 154 replies, 1 voice, and was last updated 17 years, 4 months ago by pix.
-
AuthorPosts
-
8th May 2003 at 13:35 #35463wisaGuest
How to dimensioning SDCCH channel for network with HR 30% ?
15th May 2003 at 08:16 #35464imanudinGuestwhat is this HR 30% means ?
18th May 2003 at 05:58 #35465wisaGuestHR penetration.
The system use Dynamic HR allocation. We use the threshold at 30%..it mean that when the next call coming the system will check if the idle TCH is less than 30% of total TCH in that cell.So the call will be assign with HR instead of FR.19th May 2003 at 03:41 #35466imanudinGuestDear wisa, this is the best i can find in my documentation bout Dynamic HR Allocation, i know this is not answer your question, but maybe we can discuss bout this, what kinda switch/BSC do u use ? maybe we can find more things to discuss
Dynamic HR Allocation
This feature optimises the usage of capacity when the traffic load is high, whilst it offers the best possible speech quality when the traffic load is low. This is achieved by changing the channel rate of a connection in accordance with the traffic load in the cell. At high traffic load TCH/HR is allocated and at low traffic load TCH/FR is allocated.The threshold for traffic load, parameter TLDTH, is defined by the operator. This parameter is defined as a percentage value, set per BSC, indicating the number of idle TCH/FR per total number of deblocked TCH/FR.
Depending on the traffic load condition the two following cases occur:
When the number of available TCH/FR in the cell is above the threshold value, FR resource types will have precedence over HR resource types at allocation.
When the number of available TCH/FR in the cell is below or equal the threshold value, HR resource types will have precedence over FR resource types at allocation.
At assignment, a change of priority order of preferred channel rate is only allowed if the MS has dual rate capability. At handover, a change of priority order of preferred channel rate is only allowed if the MS has dual rate capability and if the MSC allows changes between full rate and half rate also after the first channel allocation request.Within the GSM 900 band, the number of idle full rate channels is determined based on the status of the parameter for available GSM 900 bands, ERBANDSINCLUDED. If the parameter is set to OFF, then only idle full rate P-channels are considered. If the parameter is set to ON, then all idle full rate channels in all available GSM 900 bands are considered.
18th June 2003 at 15:21 #35467GKGuestCould you tell me how we can reduce SDCCH drops? And how to find out SDCCH drop reason in Ericsson BSC?
19th June 2003 at 09:46 #35468PRIYAGuesthi
HR usage was not so popular till some time ago due to the degradation in speech quality. Do you know of instances, say networks, where AMR (Adaptive multi rate speech codec)has been implemented with HR to improve upon the speech quality?Another question, at what point in the TRX configuration, like single TRX or multi TRX per cell is HR allocation preferred?
19th June 2003 at 12:18 #35469imanudinGuestsdcch drop reasons in Ericsson BSC could be find from counter that already defined in BSC, these are some :
– excessive Timing Advance
– low Signal strength
– Baq Quality
– Othersin order to reduce SDCCH drop, u must find the relevant problems
21st August 2003 at 11:58 #35470XaveGuestDoes SDDCH is useable all allong the speech communication ?
22nd August 2003 at 08:31 #35471priyaGuestSDCCH is only used for the call set-up procedure, once this is successful, a TCH is assinged if available and the SDCCH is released
3rd September 2003 at 09:02 #35472jacobGuestHi
I have a problem of low call setup success rate and high SDCCH drop, when i see the counters i don’t find any problems of interferences or bad quality (UL and DL). the cells have a good HO_Better cell and low TCH drop!!!20th January 2005 at 22:56 #35473Paritosh RaiGuestHow Dynamic SDCCH wrk in Ericssion system.
21st January 2005 at 22:18 #35474Mohammad YasinGuestHi Jacob
Please Tell me which vendor equipment you are using.I have an idea about Nokia Equipments.Regards,
5th September 2005 at 14:00 #35475marcelGuestMohammed,
Also got some SDCCH in Nokia equipment (BTS/BSC). UL/DL levels is -70?-85. UL/DL qual is 98%/97%. SDCCH drops is 20% (approx 5 drops/hour). Site is in tunnel on a LAC border. Do you have any ideas? Statistics could be better, but not that bad…
regards, Marcel
7th September 2005 at 15:03 #35476Mohammad YasinGuestHi Marcel,
Can you please tell me the value of RLT (Radio Link Timeout) and the no. of SDCCH configured in the cell are normal or more than normal.
Thanks10th September 2005 at 14:46 #35477monemGuestthis is right that HR allocation affect the SDCCH dimentioning.
But i ask about itis effect on PCH capacity. because i know there is optimum point between the SDCCH load & PCH load.
so i think this point will be change after HR implement & new related SDCCH dimentioning.
Please more clarification.
Best Regards. -
AuthorPosts
- The forum ‘Telecom Design’ is closed to new topics and replies.